Skip to content
LOS Analyzer

Organisation · 2026 filings

Duke Energy Florida — FAA obstruction filings

Duke Energy Florida filed 110 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

110

Tallest proposed

200 ft

above ground level

Most recent filing

August 27, 2026

What is being filed

  • Crane94
  • Power line16

Where

  • FL110

Most recent 50 filings

Newest first, of 110 total.

TC-177 1/2 CRANE2026-ASO-17188-OE · Crane · 160 ft AGL · Dixie, FLAugust 27, 2026TC-197 CRANE2026-ASO-14457-OE · Crane · 200 ft AGL · Dixie, FLJuly 24, 2026TC-205 CRANE2026-ASO-14459-OE · Crane · 200 ft AGL · Dixie, FLJuly 24, 2026TC-177 CRANE2026-ASO-14463-OE · Crane · 200 ft AGL · Dixie, FLJuly 24, 2026DLP-12-55 crane2026-ASO-14030-OE · Crane · 160 ft AGL · highlands, FLJuly 20, 2026DLP-12-51 crane2026-ASO-14033-OE · Crane · 160 ft AGL · highlands, FLJuly 20, 2026BWL-46-12026-ASO-12856-OE · Crane · 200 ft AGL · Bartow, FLJune 25, 2026BWL-45.5 CRANE2026-ASO-12833-OE · Crane · 200 ft AGL · Bartow, FLJune 24, 2026BWL-46 crane2026-ASO-12835-OE · Crane · 200 ft AGL · Bartow, FLJune 24, 2026BWL-46.5 crane2026-ASO-12839-OE · Crane · 200 ft AGL · Bartow, FLJune 24, 2026DLP-12-76 CRANE2026-ASO-11884-OE · Crane · 160 ft AGL · Highlands, FLJune 12, 2026TC-1992026-ASO-9752-OE · Power line · 80 ft AGL · Dixie, FLMay 12, 2026TC-1992026-ASO-9753-OE · Crane · 160 ft AGL · Dixie, FLMay 12, 2026TC-2002026-ASO-9754-OE · Power line · 80 ft AGL · Dixie, FLMay 12, 2026TC-200 CRANE2026-ASO-9756-OE · Crane · 160 ft AGL · Dixie, FLMay 12, 2026TC-2062026-ASO-9781-OE · Power line · 85 ft AGL · Dixie, FLMay 12, 2026TC-2062026-ASO-9782-OE · Crane · 160 ft AGL · Dixie, FLMay 12, 2026TC-1882026-ASO-9713-OE · Power line · 75 ft AGL · Dixie, FLMay 11, 2026TC-188 CRANE2026-ASO-9714-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1902026-ASO-9717-OE · Power line · 75 ft AGL · Dixie, FLMay 11, 2026TC-190 CRANE2026-ASO-9719-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1922026-ASO-9733-OE · Power line · 80 ft AGL · Dixie, FLMay 11, 2026TC-192 CRANE2026-ASO-9736-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1942026-ASO-9737-OE · Power line · 75 ft AGL · Dixie, FLMay 11, 2026TC-194 CRANE2026-ASO-9738-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1952026-ASO-9740-OE · Power line · 75 ft AGL · Dixie, FLMay 11, 2026TC-195 CRANE2026-ASO-9741-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1962026-ASO-9742-OE · Power line · 80 ft AGL · Dixie, FLMay 11, 2026TC-196 CRANE2026-ASO-9743-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026TC-1982026-ASO-9744-OE · Power line · 80 ft AGL · Dixie, FLMay 11, 2026TC-198 CRANE2026-ASO-9745-OE · Crane · 160 ft AGL · Dixie, FLMay 11, 2026ECTW-13 CRANE2026-ASO-9452-OE · Crane · 160 ft AGL · PINELLAS, FLMay 6, 2026ECTW-15 CRANE2026-ASO-9453-OE · Crane · 160 ft AGL · PINELLAS, FLMay 6, 2026TC-1472026-ASO-9471-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-1522026-ASO-9472-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-157 CRANE2026-ASO-9475-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-175 CRANE2026-ASO-9510-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-1802026-ASO-9516-OE · Power line · 75 ft AGL · Dixie, FLMay 6, 2026TC-180 CRANE2026-ASO-9518-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 20261832026-ASO-9519-OE · Power line · 75 ft AGL · Dixie, FLMay 6, 2026TC-183 CRANE2026-ASO-9520-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-1842026-ASO-9522-OE · Power line · 75 ft AGL · Dixie, FLMay 6, 2026TC-184 CRANE2026-ASO-9523-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026TC-1872026-ASO-9527-OE · Power line · 75 ft AGL · Dixie, FLMay 6, 2026TC-187 CRANE2026-ASO-9529-OE · Crane · 160 ft AGL · Dixie, FLMay 6, 2026QX-15 CRANE2026-ASO-7505-OE · Crane · 160 ft AGL · Quincy, FLApril 7, 2026QX-16 CRANE2026-ASO-7507-OE · Crane · 160 ft AGL · Quincy, FLApril 7, 2026QX-17 CRANE2026-ASO-7509-OE · Crane · 160 ft AGL · Quincy, FLApril 7, 2026DLP-12-59 crane2026-ASO-6840-OE · Crane · 160 ft AGL · Sebring, FLApril 1, 2026DLP-12-58 crane2026-ASO-6843-OE · Crane · 160 ft AGL · Sebring, FLApril 1, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Duke Energy Florida

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.