Skip to content
LOS Analyzer

Organisation · 2026 filings

Fitzgerald Municipal Airport — FAA obstruction filings

Fitzgerald Municipal Airport filed 16 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

16

Tallest proposed

20 ft

above ground level

Most recent filing

July 16, 2026

What is being filed

  • Construction equipment16

Where

  • GA16

Filings

Point LL2026-ASO-5499-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point L2026-ASO-5500-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point K2026-ASO-5501-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point W2026-ASO-5502-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point Z2026-ASO-5503-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point Y2026-ASO-5504-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point X2026-ASO-5505-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point J2026-ASO-5506-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point I2026-ASO-5507-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point H2026-ASO-5508-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point G2026-ASO-5509-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point F2026-ASO-5510-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point E2026-ASO-5511-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point D2026-ASO-5512-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Point C2026-ASO-5513-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026Airfield Pavement Rehabilitation2026-ASO-5514-NRA · Construction equipment · 20 ft AGL · Fitzgerald, GAJuly 16, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Fitzgerald Municipal Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.