Skip to content
LOS Analyzer

Organisation · 2026 filings

Jacksonville Electric Authority — FAA obstruction filings

Jacksonville Electric Authority filed 38 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

38

Tallest proposed

95 ft

above ground level

Most recent filing

April 28, 2026

What is being filed

  • Power line38

Where

  • FL38

Filings

066 - 9602026-ASO-8898-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026065 - 9602026-ASO-8899-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026064 - 9602026-ASO-8900-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026063 - 9602026-ASO-8901-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026062 - 9602026-ASO-8902-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026061 - 9602026-ASO-8903-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026060 - 9602026-ASO-8904-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026059 - 9602026-ASO-8905-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026058 - 9602026-ASO-8906-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026057 - 9602026-ASO-8907-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026056 - 9602026-ASO-8908-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026055 - 9602026-ASO-8909-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026054 - 9602026-ASO-8910-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026053 - 9602026-ASO-8911-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026052 - 9602026-ASO-8912-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026051 - 9602026-ASO-8913-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026050 - 9602026-ASO-8914-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026049 - 9602026-ASO-8915-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026048 - 9602026-ASO-8916-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026084 - 9542026-ASO-8917-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026083 - 9542026-ASO-8918-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026082 - 9542026-ASO-8919-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026081 - 9542026-ASO-8920-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026080 - 9542026-ASO-8921-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026079 - 9542026-ASO-8922-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026078 - 9542026-ASO-8923-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026077 - 9542026-ASO-8924-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026076 - 9542026-ASO-8925-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026075 - 9542026-ASO-8926-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026074 - 9542026-ASO-8927-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026073 - 9542026-ASO-8928-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026072 - 9542026-ASO-8929-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026071 - 9542026-ASO-8930-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026070 - 9542026-ASO-8931-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026069 - 9542026-ASO-8932-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026068 - 9542026-ASO-8933-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026067 - 9542026-ASO-8934-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026066 - 9542026-ASO-8935-OE · Power line · 95 ft AGL · Jacksonville, FLApril 28, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Jacksonville Electric Authority

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.