Skip to content
LOS Analyzer

Organisation · 2026 filings

Joplin Regional Airport — FAA obstruction filings

Joplin Regional Airport filed 28 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

28

Tallest proposed

75 ft

above ground level

Most recent filing

June 3, 2026

What is being filed

  • Construction equipment28

Where

  • MO28

Filings

Construction Point 42026-ACE-3262-NRA · Construction equipment · 75 ft AGL · Joplin, MOJune 3, 2026Construction Point 32026-ACE-3263-NRA · Construction equipment · 75 ft AGL · Joplin, MOJune 3, 2026Construction Point 22026-ACE-3264-NRA · Construction equipment · 75 ft AGL · Joplin, MOJune 3, 2026Construction Point 12026-ACE-3265-NRA · Construction equipment · 75 ft AGL · Joplin, MOJune 3, 2026Construction Point 242026-ACE-3212-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 232026-ACE-3213-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 222026-ACE-3214-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 212026-ACE-3215-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 202026-ACE-3216-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 192026-ACE-3217-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 182026-ACE-3218-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 172026-ACE-3219-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 162026-ACE-3220-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 152026-ACE-3221-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 122026-ACE-3222-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 132026-ACE-3223-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 142026-ACE-3224-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 112026-ACE-3225-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 102026-ACE-3226-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 92026-ACE-3227-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 82026-ACE-3228-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 72026-ACE-3229-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 62026-ACE-3230-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 12026-ACE-3231-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 22026-ACE-3232-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 32026-ACE-3233-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 42026-ACE-3234-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026Construction Point 52026-ACE-3235-NRA · Construction equipment · 25 ft AGL · Joplin, MOJune 2, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Joplin Regional Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.