Skip to content
LOS Analyzer

Organisation · 2026 filings

KLJ — FAA obstruction filings

KLJ filed 35 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

35

Tallest proposed

50 ft

above ground level

Most recent filing

March 24, 2026

What is being filed

  • Construction equipment26
  • Building4
  • Crane4
  • Pole lighting1

Where

  • ND35

Filings

Proposed Electrical Vault Building2026-AGL-4886-NRA · Building · 12 ft AGL · Beach, NDMarch 24, 2026North Building Corner2026-AGL-4887-NRA · Building · 12 ft AGL · Beach, NDMarch 24, 2026East Building Corner2026-AGL-4888-NRA · Building · 12 ft AGL · Beach, NDMarch 24, 2026South Building Corner2026-AGL-4889-NRA · Building · 12 ft AGL · Beach, NDMarch 24, 2026Construction Equipment for Project2026-AGL-4840-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 12026-AGL-4841-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 22026-AGL-4842-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 32026-AGL-4843-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 42026-AGL-4844-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 52026-AGL-4845-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 62026-AGL-4846-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 72026-AGL-4847-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 82026-AGL-4848-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 92026-AGL-4849-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 102026-AGL-4850-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 112026-AGL-4851-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 122026-AGL-4852-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 132026-AGL-4853-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 142026-AGL-4854-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 152026-AGL-4855-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 162026-AGL-4856-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 172026-AGL-4857-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 182026-AGL-4858-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 192026-AGL-4859-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 202026-AGL-4860-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Construction Area Limit - 212026-AGL-4861-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Contractor Staging/Sorage Area - 12026-AGL-4862-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Contractor Staging/Sorage Area - 22026-AGL-4863-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Contractor Staging/Sorage Area - 32026-AGL-4864-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Contractor Staging/Sorage Area - 42026-AGL-4865-NRA · Construction equipment · 25 ft AGL · Beach, NDMarch 23, 2026Crane for Electrical Equipment Install2026-AGL-4866-NRA · Crane · 50 ft AGL · Beach, NDMarch 23, 2026Crane Operation Area - 22026-AGL-4867-NRA · Crane · 50 ft AGL · Beach, NDMarch 23, 2026Crane Operation Area - 32026-AGL-4868-NRA · Crane · 50 ft AGL · Beach, NDMarch 23, 2026Crane Operation Area - 42026-AGL-4869-NRA · Crane · 50 ft AGL · Beach, NDMarch 23, 2026Proposed Airport Rotating Beacon Pole2026-AGL-4871-NRA · Pole lighting · 35 ft AGL · Beach, NDMarch 23, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch KLJ

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.