Skip to content
LOS Analyzer

Organisation · 2026 filings

Lone Star Transmission, LLC- SIIS — FAA obstruction filings

Lone Star Transmission, LLC- SIIS filed 39 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

39

Tallest proposed

157 ft

above ground level

Most recent filing

January 22, 2026

What is being filed

  • Power line39

Where

  • TX39

Filings

T392026-ASW-1484-OE · Power line · 122 ft AGL · Putnam, TXJanuary 22, 2026T382026-ASW-1485-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T372026-ASW-1486-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T362026-ASW-1487-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T352026-ASW-1488-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T342026-ASW-1489-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T332026-ASW-1490-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T322026-ASW-1491-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T312026-ASW-1492-OE · Power line · 122 ft AGL · Putnam, TXJanuary 22, 2026T302026-ASW-1493-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T292026-ASW-1494-OE · Power line · 100 ft AGL · Putnam, TXJanuary 22, 2026T282026-ASW-1495-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T272026-ASW-1496-OE · Power line · 142 ft AGL · Putnam, TXJanuary 22, 2026T262026-ASW-1497-OE · Power line · 157 ft AGL · Putnam, TXJanuary 22, 2026T252026-ASW-1498-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T242026-ASW-1499-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T232026-ASW-1500-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T222026-ASW-1501-OE · Power line · 100 ft AGL · Putnam, TXJanuary 22, 2026T212026-ASW-1502-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T202026-ASW-1503-OE · Power line · 122 ft AGL · Putnam, TXJanuary 22, 2026T192026-ASW-1504-OE · Power line · 110 ft AGL · Putnam, TXJanuary 22, 2026T182026-ASW-1505-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T172026-ASW-1506-OE · Power line · 110 ft AGL · Putnam, TXJanuary 22, 2026T162026-ASW-1507-OE · Power line · 142 ft AGL · Putnam, TXJanuary 22, 2026T152026-ASW-1508-OE · Power line · 142 ft AGL · Putnam, TXJanuary 22, 2026T142026-ASW-1509-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T132026-ASW-1510-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T122026-ASW-1511-OE · Power line · 110 ft AGL · Putnam, TXJanuary 22, 2026T112026-ASW-1512-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T102026-ASW-1513-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T092026-ASW-1514-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T082026-ASW-1515-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T072026-ASW-1516-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T062026-ASW-1517-OE · Power line · 105 ft AGL · Putnam, TXJanuary 22, 2026T052026-ASW-1518-OE · Power line · 110 ft AGL · Putnam, TXJanuary 22, 2026T042026-ASW-1519-OE · Power line · 115 ft AGL · Putnam, TXJanuary 22, 2026T032026-ASW-1520-OE · Power line · 120 ft AGL · Putnam, TXJanuary 22, 2026T022026-ASW-1521-OE · Power line · 130 ft AGL · Putnam, TXJanuary 22, 2026T012026-ASW-1522-OE · Power line · 122 ft AGL · Putnam, TXJanuary 22, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Lone Star Transmission, LLC- SIIS

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.