MaineDOT — FAA obstruction filings

MaineDOT filed 86 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

86

Tallest proposed

110 ft

above ground level

Most recent filing

May 8, 2026

What is being filed

  • Pole lighting54
  • Construction equipment20
  • Crane12

Where

  • ME86

Most recent 50 filings

Newest first, of 86 total.

POI 102026-ANE-750-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 92026-ANE-751-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 82026-ANE-752-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 72026-ANE-753-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 62026-ANE-754-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 52026-ANE-755-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 42026-ANE-756-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 32026-ANE-757-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 22026-ANE-758-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026Construction Equipment2026-ANE-759-NRA · Construction equipment · 25 ft AGL · Greenville, MEMay 8, 2026POI 102026-ANE-760-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 92026-ANE-761-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 82026-ANE-762-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 72026-ANE-763-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 62026-ANE-764-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 52026-ANE-765-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 42026-ANE-766-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 32026-ANE-767-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 22026-ANE-768-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026Construction Equipment2026-ANE-769-NRA · Construction equipment · 25 ft AGL · Norridgewock, MEMay 8, 2026POI 42026-ANE-770-NRA · Crane · 40 ft AGL · Greenville, MEMay 8, 2026POI 32026-ANE-771-NRA · Crane · 40 ft AGL · Greenville, MEMay 8, 2026POI 22026-ANE-772-NRA · Crane · 40 ft AGL · Greenville, MEMay 8, 2026Crane POI 12026-ANE-773-NRA · Crane · 40 ft AGL · Greenville, MEMay 8, 2026POI 42026-ANE-774-NRA · Crane · 40 ft AGL · Norridgewock, MEMay 8, 2026POI 32026-ANE-775-NRA · Crane · 40 ft AGL · Norridgewock, MEMay 8, 2026POI 22026-ANE-776-NRA · Crane · 40 ft AGL · Norridgewock, MEMay 8, 2026Crane POI 12026-ANE-777-NRA · Crane · 40 ft AGL · Norridgewock, MEMay 8, 2026POI 42026-ANE-778-NRA · Crane · 40 ft AGL · Sugarloaf, MEMay 8, 2026POI 32026-ANE-779-NRA · Crane · 40 ft AGL · Sugarloaf, MEMay 8, 2026POI 22026-ANE-780-NRA · Crane · 40 ft AGL · Sugarloaf, MEMay 8, 2026Crane POI 12026-ANE-781-NRA · Crane · 40 ft AGL · Sugarloaf, MEMay 8, 2026UP20152026-ANE-575-OE · Pole lighting · 35 ft AGL · South Portland, MEFebruary 26, 2026UP17952026-ANE-576-OE · Pole lighting · 54 ft AGL · South Portland, MEFebruary 26, 2026UP15252026-ANE-577-OE · Pole lighting · 47 ft AGL · South Portland, MEFebruary 26, 2026UP14552026-ANE-578-OE · Pole lighting · 31 ft AGL · South Portland, MEFebruary 26, 2026MA-22026-ANE-579-OE · Pole lighting · 22 ft AGL · South Portland, MEFebruary 26, 2026MA12026-ANE-580-OE · Pole lighting · 21 ft AGL · South Portland, MEFebruary 26, 2026OHSS12026-ANE-581-OE · Pole lighting · 31 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T8-243632026-ANE-582-OE · Pole lighting · 99 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T7-243632026-ANE-583-OE · Pole lighting · 110 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T6-243632026-ANE-584-OE · Pole lighting · 110 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T4-243632026-ANE-586-OE · Pole lighting · 110 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T2-243632026-ANE-588-OE · Pole lighting · 110 ft AGL · South Portland, MEFebruary 26, 2026Light Pole T1-243632026-ANE-589-OE · Pole lighting · 65 ft AGL · South Portland, MEFebruary 26, 2026Light Pole SB15-243632026-ANE-590-OE · Pole lighting · 26 ft AGL · South Portland, MEFebruary 26, 2026Light Pole SB9-243632026-ANE-591-OE · Pole lighting · 26 ft AGL · South Portland, MEFebruary 26, 2026Light Pole SB14-243632026-ANE-592-OE · Pole lighting · 26 ft AGL · South Portland, MEFebruary 26, 2026Light Pole SB13-243632026-ANE-593-OE · Pole lighting · 26 ft AGL · South Portland, MEFebruary 26, 2026Light Pole SB12-243632026-ANE-594-OE · Pole lighting · 26 ft AGL · South Portland, MEFebruary 26, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch MaineDOT

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.