Skip to content
LOS Analyzer

Organisation · 2026 filings

MENA Intermountain Municipal Airport — FAA obstruction filings

MENA Intermountain Municipal Airport filed 31 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

31

Tallest proposed

15 ft

above ground level

Most recent filing

April 2, 2026

What is being filed

  • Construction equipment30
  • Road rail1

Where

  • AR31

Filings

Phase 1 Temp Limits 12026-ASW-1508-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 22026-ASW-1509-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 32026-ASW-1510-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 42026-ASW-1511-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 52026-ASW-1512-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 62026-ASW-1513-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 72026-ASW-1514-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 82026-ASW-1515-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 92026-ASW-1516-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 1 Temp Limits 102026-ASW-1517-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 12026-ASW-1534-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 22026-ASW-1535-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 32026-ASW-1536-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 42026-ASW-1537-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 52026-ASW-1538-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 62026-ASW-1539-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 72026-ASW-1540-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 82026-ASW-1541-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 92026-ASW-1542-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 2 Temp Limits 102026-ASW-1543-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 12026-ASW-1544-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 22026-ASW-1545-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 32026-ASW-1546-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 42026-ASW-1547-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 52026-ASW-1548-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 62026-ASW-1549-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 72026-ASW-1550-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 82026-ASW-1551-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 92026-ASW-1552-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Phase 3 Temp Limits 102026-ASW-1553-NRA · Construction equipment · 15 ft AGL · Mena, ARApril 2, 2026Taxiway B Extension Permanent Airspacing2026-ASW-1420-NRA · Road rail · 15 ft AGL · Mena, ARMarch 26, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch MENA Intermountain Municipal Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.