Skip to content
LOS Analyzer

Organisation · 2026 filings

Ogemaw SPV, LLC — FAA obstruction filings

Ogemaw SPV, LLC filed 24 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

24

Tallest proposed

678 ft

above ground level

Most recent filing

May 12, 2026

What is being filed

  • Wind turbine24

Where

  • MI24

Filings

WTG022026-WTE-2210-OE · Wind turbine · 678 ft AGL · Rose City, MIMay 12, 2026WTG_142026-WTE-1642-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_152026-WTE-1643-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_162026-WTE-1644-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_172026-WTE-1645-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_182026-WTE-1646-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_192026-WTE-1647-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_202026-WTE-1648-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_212026-WTE-1649-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_222026-WTE-1650-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_232026-WTE-1651-OE · Wind turbine · 678 ft AGL · Lupton, MIMarch 30, 2026WTG_012026-WTE-1629-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_022026-WTE-1630-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_032026-WTE-1631-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_042026-WTE-1632-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_052026-WTE-1633-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_062026-WTE-1634-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_072026-WTE-1635-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_082026-WTE-1636-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_092026-WTE-1637-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_102026-WTE-1638-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_112026-WTE-1639-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_122026-WTE-1640-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026WTG_132026-WTE-1641-OE · Wind turbine · 678 ft AGL · Rose City, MIMarch 28, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Ogemaw SPV, LLC

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.