Skip to content
LOS Analyzer

Organisation · 2026 filings

PARK Avenue Solar Solutions, LLC — FAA obstruction filings

PARK Avenue Solar Solutions, LLC filed 32 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

32

Tallest proposed

90 ft

above ground level

Most recent filing

April 7, 2026

What is being filed

  • Building29
  • Construction equipment2
  • Power line1

Where

  • NY28
  • IL4

Filings

Bldg G-North BPV Roof Solar (Altus Power)2026-AEA-4368-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg G-South BPV Roof Solar (Altus Power)2026-AEA-4369-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg H2-BPV Roof Solar (Altus Power)2026-AEA-4375-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg H1-BPV Rooftop Solar (Altus Power)2026-AEA-4376-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg J1-BPV Rooftop Solar (Altus Power)2026-AEA-4377-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg J1-South-BPV Roof Solar (Altus Power)2026-AEA-4378-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg J2-North-BPV Roof Solar (Altus Power)2026-AEA-4379-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg J3-South BPV Roof Solar (Altus Power)2026-AEA-4380-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg K3-BPV Rooftop Solar (Altus Power)2026-AEA-4381-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg K2-BPV Rooftop Solar (Altus Power)2026-AEA-4382-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Bldg Mgmt-BPV Rooftop Solar (Altus Power)2026-AEA-4383-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026VIP BPV Rooftop Solar (Altus Power)2026-AEA-4384-OE · Building · 60 ft AGL · Elmont, NYApril 7, 2026Raised solar array atop parking garage2026-AEA-4340-OE · Building · 90 ft AGL · Elmont, NYApril 6, 2026Bldg B1 BPV Rooftop Solar (Altus Power)2026-AEA-4341-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg B2 BPV Rooftop Solar (Altus Power)2026-AEA-4342-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg B3 BPV Rooftop Solar (Altus Power)2026-AEA-4344-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg C-East BPV Roof Solar (Altus Power)2026-AEA-4345-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg C-West BPV Roof Solar (Altus Power)2026-AEA-4346-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg D-North BPV Roof Solar (Altus Power)2026-AEA-4347-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg D-South BPV Roof Solar (Altus Power)2026-AEA-4349-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg E-North BPV Roof Solar (Altus Power)2026-AEA-4350-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg E-South BPV Roof Solar (Altus Power)2026-AEA-4351-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg A-South BPV Roof Solar (Altus Power)2026-AEA-4352-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg F1-North BPV Roof Solar (Altus Power)2026-AEA-4353-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg F2-BPV Rooftop Solar (Altus Power)2026-AEA-4354-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Bldg F2-South BPV Roof Solar (Altus Power)2026-AEA-4355-OE · Building · 60 ft AGL · Elmont, NYApril 6, 2026Building A-BPV Rooftop Solar (Altus Power)2026-AEA-4224-OE · Building · 60 ft AGL · Elmont, NYApril 1, 2026Building A-BPV Rooftop Solar (Altus Power)2026-AEA-4227-OE · Building · 60 ft AGL · Elmont, NYApril 1, 2026220 N York Stairtower (PV install)2026-AGL-4836-OE · Construction equipment · 50 ft AGL · Bensenville, ILMarch 20, 2026Rooftop solar array at industrial building2026-AGL-4564-OE · Building · 45 ft AGL · Bensenville, ILMarch 12, 2026220 N York Stairtower (PV install)2026-AGL-4303-OE · Construction equipment · 40 ft AGL · Bensenville, ILMarch 9, 2026Utility new riser recloser pole (POI)2026-AGL-1117-OE · Power line · 45 ft AGL · Bensenville, ILJanuary 13, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch PARK Avenue Solar Solutions, LLC

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.