SALT River Project — FAA obstruction filings

SALT River Project filed 22 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

22

Tallest proposed

164 ft

above ground level

Most recent filing

February 26, 2026

What is being filed

  • Crane11
  • Power line11

Where

  • AZ22

Filings

CP-4-Mada2026-AWP-3778-OE · Crane · 164 ft AGL · Mesa, AZFebruary 26, 2026CP-3-Mada2026-AWP-3779-OE · Crane · 164 ft AGL · Mesa, AZFebruary 26, 2026CP-2-Mada2026-AWP-3780-OE · Crane · 164 ft AGL · Mesa, AZFebruary 26, 2026CP-1-Mada2026-AWP-3781-OE · Crane · 164 ft AGL · Mesa, AZFebruary 26, 2026CP-4-Mada2026-AWP-3782-OE · Power line · 50 ft AGL · Mesa, AZFebruary 26, 2026CP-3-Mada2026-AWP-3783-OE · Power line · 61 ft AGL · Mesa, AZFebruary 26, 2026CP-2-Mada2026-AWP-3784-OE · Power line · 61 ft AGL · Mesa, AZFebruary 26, 2026CP-1-Mada2026-AWP-3785-OE · Power line · 61 ft AGL · Mesa, AZFebruary 26, 2026CP-31-Buckhorn-Lehi Crane2026-AWP-3177-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-19-Buckhorn-Lehi Crane2026-AWP-3178-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-14-Buckhorn-Lehi Crane2026-AWP-3179-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-9-Buckhorn-Lehi Crane2026-AWP-3180-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-6-Buckhorn-Lehi Crane2026-AWP-3181-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-4-Buckhorn-Lehi Crane2026-AWP-3182-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-3-Buckhorn-Lehi Crane2026-AWP-3183-OE · Crane · 164 ft AGL · Mesa, AZFebruary 18, 2026CP-31-Buckhorn-Lehi2026-AWP-3184-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-19-Buckhorn-Lehi2026-AWP-3185-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-14-Buckhorn-Lehi2026-AWP-3186-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-9-Buckhorn-Lehi2026-AWP-3187-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-6-Buckhorn-Lehi2026-AWP-3188-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-4-Buckhorn-Lehi2026-AWP-3189-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026CP-3-Buckhorn-Lehi2026-AWP-3190-OE · Power line · 66 ft AGL · Mesa, AZFebruary 18, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch SALT River Project

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.