Organisation · 2026 filings
SQF, LLC — FAA obstruction filings
SQF, LLC filed 48 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.
Filings in 2026
48
Tallest proposed
345 ft
above ground level
Most recent filing
August 27, 2026
What is being filed
- Pole lighting25
- Antenna tower23
Where
- CO20
- TX10
- LA7
- AR4
- GA2
- ME2
Filings
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.