Skip to content
LOS Analyzer

Organisation · 2026 filings

States EDGE WIND I LLC — FAA obstruction filings

States EDGE WIND I LLC filed 25 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

25

Tallest proposed

665 ft

above ground level

Most recent filing

March 12, 2026

What is being filed

  • Wind turbine25

Where

  • OK25

Filings

10252026-WTW-2455-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610242026-WTW-2456-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610222026-WTW-2457-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610232026-WTW-2458-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610212026-WTW-2459-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610202026-WTW-2460-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610192026-WTW-2461-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610182026-WTW-2462-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610172026-WTW-2463-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610162026-WTW-2464-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610122026-WTW-2468-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610152026-WTW-2465-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610142026-WTW-2466-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610132026-WTW-2467-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610112026-WTW-2469-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610102026-WTW-2470-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610092026-WTW-2471-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610082026-WTW-2472-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610072026-WTW-2473-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610062026-WTW-2474-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610052026-WTW-2475-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610042026-WTW-2476-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610032026-WTW-2477-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610022026-WTW-2478-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 202610012026-WTW-2479-OE · Wind turbine · 665 ft AGL · Boise City, OK, OKMarch 12, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch States EDGE WIND I LLC

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.