Organisation · 2026 filings
Vertical Bridge Development, LLC — FAA obstruction filings
Vertical Bridge Development, LLC filed 16 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.
Filings in 2026
16
Tallest proposed
365 ft
above ground level
Most recent filing
August 11, 2026
What is being filed
- Antenna tower16
Where
- IA3
- KS2
- MT2
- MS2
- NC1
- TN1
Filings
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Planning something here?
Screen it against Part 77 before you file
LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.