Skip to content
LOS Analyzer

Organisation · 2026 filings

Watertown Regional Airport — FAA obstruction filings

Watertown Regional Airport filed 27 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

27

Tallest proposed

15 ft

above ground level

Most recent filing

January 28, 2026

What is being filed

  • Construction equipment27

Where

  • SD27

Filings

ATY TXY A Haul Route (Phase 3)2026-AGL-1051-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 3 - Point 4)2026-AGL-1052-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 3 - Point 3)2026-AGL-1053-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 3 - Point 2)2026-AGL-1054-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 3 - Point 1)2026-AGL-1055-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (Phase 2)2026-AGL-1056-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 2 - Point 5)2026-AGL-1057-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 2 - Point 4)2026-AGL-1058-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 2 - Point 3)2026-AGL-1059-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 2 - Point 2)2026-AGL-1060-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 2 - Point 1)2026-AGL-1061-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (Phase 1)2026-AGL-1062-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (Phases 1/2)2026-AGL-1063-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (All Phases - 14)2026-AGL-1064-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (All Phases - 13)2026-AGL-1065-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (All Phases - 12)2026-AGL-1066-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (All Phases - 11)2026-AGL-1067-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Haul Route (All Phases - 10)2026-AGL-1068-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Staging Area (All Phases - 9)2026-AGL-1069-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Staging Area (All Phases - 8)2026-AGL-1070-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Staging Area (All Phases - 7)2026-AGL-1071-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Staging Area (All Phases - 6)2026-AGL-1072-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 1 - Point 5)2026-AGL-1073-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 1 - Point 4)2026-AGL-1074-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 1 - Point 3)2026-AGL-1075-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area (Phase 1 - Point 2)2026-AGL-1076-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026ATY TXY A Work Area - Phase 12026-AGL-1077-NRA · Construction equipment · 15 ft AGL · Watertown, SDJanuary 28, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Watertown Regional Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.