Skip to content
LOS Analyzer

Organisation · 2026 filings

WSP USA, INC. — FAA obstruction filings

WSP USA, INC. filed 102 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

102

Tallest proposed

60 ft

above ground level

Most recent filing

April 27, 2026

What is being filed

  • Rig82
  • Crane16
  • Construction equipment4

Where

  • ME82
  • KY16
  • CT4

Most recent 50 filings

Newest first, of 102 total.

Drilling Area T Point 822026-ANE-612-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area T Point 812026-ANE-613-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area T Point 802026-ANE-614-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area T Point 792026-ANE-615-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area S Point 782026-ANE-616-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area S Point 772026-ANE-617-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area S Point 762026-ANE-618-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area S Point 752026-ANE-619-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area R Point 742026-ANE-620-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area R Point 732026-ANE-621-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area R Point 722026-ANE-622-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area Q Point 712026-ANE-623-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area Q Point 702026-ANE-624-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area Q Point 692026-ANE-625-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area Q Point 682026-ANE-626-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area P Point 672026-ANE-627-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area P Point 662026-ANE-628-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area P Point 652026-ANE-629-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area P Point 642026-ANE-630-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 632026-ANE-631-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 622026-ANE-632-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 612026-ANE-633-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 602026-ANE-634-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 592026-ANE-635-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area O Point 582026-ANE-636-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area N Point 572026-ANE-637-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area N Point 562026-ANE-638-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area N Point 552026-ANE-639-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area N Point 542026-ANE-640-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area M Point 532026-ANE-641-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area M Point 522026-ANE-642-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area M Point 512026-ANE-643-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area M Point 502026-ANE-644-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area L Point 492026-ANE-645-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area L Point 482026-ANE-646-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area L Point 472026-ANE-647-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area L Point 462026-ANE-648-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area K Point 452026-ANE-649-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area K Point 442026-ANE-650-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area K Point 432026-ANE-651-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area K Point 422026-ANE-652-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area J Point 412026-ANE-653-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area J Point 402026-ANE-654-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area J Point 392026-ANE-655-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area J Point 382026-ANE-656-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area J Point 372026-ANE-657-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area I Point 362026-ANE-658-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area I Point 352026-ANE-659-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area I Point 342026-ANE-660-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026Drilling Area I Point 332026-ANE-661-NRA · Rig · 32 ft AGL · Bangor, MEApril 27, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch WSP USA, INC.

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.