Skip to content
LOS Analyzer

Road rail · 2026

Proposed Tug Road Point P-23

Anchorage, AK · near Lake Hood (1.9 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Elevation points along the alignment of the proposed Tug Road"

Filing details

Case number (ASN)
2026-AAL-1445-NRA
Structure
Proposed Tug Road Point P-23
Type
Traverse_way / private_road
Category
Road rail
Height above ground
15 ft
Height above sea level
172 ft
Site elevation
157 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 17, 2026
Determined
June 26, 2026
Determination expires
—

Who filed it

Sponsor
AK DOT&PF
Representative
AK DOT&PF

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by AK DOT&PF →

Location

Coordinates
61.202156, -150.012308
Degrees / minutes / seconds
61°12'07.8"N 150°00'44.3"W
County
Anchorage

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Lake Hood →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.