Skip to content
LOS Analyzer

Antenna tower · 2026

Pilot Point Rohn 65G 1048

Pilot Point, AK · near Pilot Point (0.9 mi)

Determination of no hazardDetermined - No Hazard70 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"AWN is proposing to add the 600 & 14000 MHz frequency bands"

Filing details

Case number (ASN)
2026-AAL-274-OE
Structure
Pilot Point Rohn 65G 1048
Type
Tower / antenna
Category
Antenna tower
Height above ground
70 ft
Height above sea level
191 ft
Site elevation
121 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
May 11, 2026
Determined
May 19, 2026
Determination expires
—

Who filed it

Sponsor
Alaska Wireless Network
Representative
Cindy Hall

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Alaska Wireless Network →

Location

Coordinates
57.567400, -157.574461
Degrees / minutes / seconds
57°34'02.6"N 157°34'28.1"W
County
Lake and Peninsula

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.