Skip to content
LOS Analyzer

Antenna tower · 2026

Point Hope 2

Point Hope, AK · near Point Hope (1.7 mi)

Determination of no hazardDetermined - No Hazard80 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Microwave link."

Filing details

Case number (ASN)
2026-AAL-335-OE
Structure
Point Hope 2
Type
Tower / antenna
Category
Antenna tower
Height above ground
80 ft
Height above sea level
98 ft
Site elevation
18 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 11, 2026
Determined
July 14, 2026
Determination expires
January 14, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Arctic Slope Telephone Association Cooperative
Representative
Arctic Slope Telephone Association Cooperative, IN

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
68.346425, -166.733111
Degrees / minutes / seconds
68°20'47.1"N 166°43'59.2"W
County
North Slope

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.