Skip to content
LOS Analyzer

Building · 2026

Building G / Nome Staff Housing - Phase 2

Nome, AK · near Nome City Fld (0.7 mi)

Determination of no hazardDetermined - No Hazard38 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"The \Nome Staff Housing - Phase 2\" project will begin in August 2026 and conclude in mid-late 2027. We will be constructing two buildings (A and G). Values for both were input in the pre-screening tool though only building G's output indicated a notice was required.""

Filing details

Case number (ASN)
2026-AAL-354-OE
Structure
Building G / Nome Staff Housing - Phase 2
Type
Building
Category
Building
Height above ground
38 ft
Height above sea level
113 ft
Site elevation
75 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 17, 2026
Determined
July 16, 2026
Determination expires
January 16, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Norton Sound Health Corporation
Representative
Norton Sound Health Corporation

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
64.501839, -165.380206
Degrees / minutes / seconds
64°30'06.6"N 165°22'48.7"W
County
Nome

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.