Skip to content
LOS Analyzer

Construction equipment · 2026

Ogallala Runway Safety and Phasing 21

Ogallala, NE · near Searle Fld (0.9 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Rehabilitate Runway 8/26 (115 total working days)\n\nPhase 1: Reconstruct Runway 13 end and construct connector to apron (25 Days)\n\nPhase 2: Reconstruct Runway 8/26 and turnaround (65 Days)\n\nPhase 3: Rehabilitate complete marking and install lighting on runway 13/31 (25 Days)"

Filing details

Case number (ASN)
2026-ACE-1121-NRA
Structure
Ogallala Runway Safety and Phasing 21
Type
Construction / other
Category
Construction equipment
Height above ground
15 ft
Height above sea level
3,287 ft
Site elevation
3,272 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 24, 2026
Determined
April 14, 2026
Determination expires
October 14, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Ogallala
Representative
Olsson - Aviation TEAM

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Ogallala →

Location

Coordinates
41.119047, -101.786411
Degrees / minutes / seconds
41°07'08.6"N 101°47'11.1"W
County
Keith

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Searle Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.