Skip to content
LOS Analyzer

Construction equipment · 2026

Pittsburg Runway Rehab CSPP 5

Pittsburg, KS · near Atkinson Muni (0.6 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Rehabilitate Runway 17/35 And Runway 17 Turnaround\n3 Phases 35 days total\nPhase 1: Rehabilitate runway 17/35 and Runway 17 Turnaround (Outside of Runway 4/22 Object Free Area (ROFA)) (28 Calendar Days)\nPhase 2: Rehabilitate Runway 17/35 (Inside Runway 4/22 Object Free Area (ROFA)) (4 Calendar Days)\nPhase 3: Permanent Pavement Marking (3 Calendar Days)"

Filing details

Case number (ASN)
2026-ACE-1374-NRA
Structure
Pittsburg Runway Rehab CSPP 5
Type
Construction / other
Category
Construction equipment
Height above ground
15 ft
Height above sea level
946 ft
Site elevation
931 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 9, 2026
Determined
April 15, 2026
Determination expires
October 15, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Pittsburg
Representative
Olsson - Aviation TEAM

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by City of Pittsburg →

Location

Coordinates
37.441839, -94.728883
Degrees / minutes / seconds
37°26'30.6"N 94°43'44.0"W
County
Crawford

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Atkinson Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.