Skip to content
LOS Analyzer

Antenna tower · 2026

Bellwood

Bellwood, NE · near Columbus Muni (7.4 mi)

Determination of no hazardDetermined - No Hazard288 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Proposed 288' agl self-support tower. Jim O'Dowd/Verizon Wireless/ 908-306-7439"

Filing details

Case number (ASN)
2026-ACE-1893-OE
Structure
Bellwood
Type
Tower / antenna
Category
Antenna tower
Height above ground
288 ft
Height above sea level
1,739 ft
Site elevation
1,451 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
April 21, 2026
Determined
April 23, 2026
Determination expires
—

Who filed it

Sponsor
* Cellco Partnership
Representative
Network Regulatory - C

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by * Cellco Partnership →

Location

Coordinates
41.348075, -97.291219
Degrees / minutes / seconds
41°20'53.1"N 97°17'28.4"W
County
Butler

See every 2026 filing near Columbus Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.