Skip to content
LOS Analyzer

Construction equipment · 2026

Loup City Rehab Safety and Phasing 12

Loup City, NE · near Loup City Muni (0.1 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Complete Pavement Rehabilitation at Loup City Municipal Airport"

Filing details

Case number (ASN)
2026-ACE-33-NRA
Structure
Loup City Rehab Safety and Phasing 12
Type
Construction / other
Category
Construction equipment
Height above ground
15 ft
Height above sea level
2,085 ft
Site elevation
2,070 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 6, 2026
Determined
March 11, 2026
Determination expires
September 11, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Loup City Airport Authority
Representative
Olsson - Aviation TEAM

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Loup City Airport Authority →

Location

Coordinates
41.286686, -98.988025
Degrees / minutes / seconds
41°17'12.1"N 98°59'16.9"W
County
Sherman

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Loup City Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.