Skip to content
LOS Analyzer

Antenna tower · 2026

Leslie MO (305903)

Gerald, MO · near Sullivan Rgnl (16.2 mi)

Marking and lightingRevision305 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Lighting system is operational as an E style under Advisory Circular 1M. Please include 1M on the DNH once issued."

Filing details

Case number (ASN)
2026-ACE-3520-OE
Structure
Leslie MO (305903)
Type
Tower / antenna
Category
Antenna tower
Height above ground
305 ft
Height above sea level
1,088 ft
Site elevation
783 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
July 29, 2026
Determined
August 3, 2026
Determination expires
—

Who filed it

Sponsor
American Towers LLC - BC
Representative
Bridget Carter

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by American Towers LLC - BC →

Location

Coordinates
38.454250, -91.265639
Degrees / minutes / seconds
38°27'15.3"N 91°15'56.3"W
County
Franklin

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Sullivan Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.