Skip to content
LOS Analyzer

Crane · 2026

Suffolk/DataCenter/MobileCrane/DC5/Laydown

Cedar Rapids, IA · near The Eastern Iowa (1.4 mi)

Determination of no hazardDetermined - No Hazard112 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"This area is a material storage/staging zone for a construction project taking place north of 76th AVE SW. There will be a mobile crane working in this area loading and unloading trucks."

Filing details

Case number (ASN)
2026-ACE-419-OE
Structure
Suffolk/DataCenter/MobileCrane/DC5/Laydown
Type
Crane / mobile
Category
Crane
Height above ground
112 ft
Height above sea level
965 ft
Site elevation
853 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
Red lights and flags

Timeline

Filed
January 22, 2026
Determined
February 18, 2026
Determination expires
August 18, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Dilling Group, Inc.
Representative
Dilling Group, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
41.900269, -91.726881
Degrees / minutes / seconds
41°54'01.0"N 91°43'36.8"W
County
Linn

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near The Eastern Iowa →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.