Construction equipment · 2026
Augusta AWOS III Safety and Phasing 47
Augusta, KS · near Augusta Muni (0.2 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"CONSTRUCT AWOS III (P/T)\n3 Phases 50 Days total\nPhase 1: CLEARING AND GRUBBING INSTALLATION OF NEW FENCE (10 Calendar Days)\nPhase 2: SITE GRADING ELECTRICAL SERVICE ROAD INSTALLATION (OUTSIDE RSA) AND AWOS INSTALL (30 Calendar Days)\nPhase 2A: CONCRETE ROAD (WITHIN RSA) CONCRETE DITCH CROSSING AWOS FOUNDATIONS (5 Consecutive Calendar Days Within the 30 Days for Phase 2)\nPhase 3: DECOMMISSIONING AND DEMOLITION OF EXISTING AWOS (10 Calendar Days)"
Filing details
- Case number (ASN)
- 2026-ACE-68-NRA
- Structure
- Augusta AWOS III Safety and Phasing 47
- Type
- Construction / other
- Category
- Construction equipment
- Height above ground
- 15 ft
- Height above sea level
- 1,340 ft
- Site elevation
- 1,325 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- January 8, 2026
- Determined
- March 31, 2026
- Determination expires
- September 30, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- City of Augusta
- Representative
- Olsson - Aviation TEAM
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 37.672514, -97.079186
- Degrees / minutes / seconds
- 37°40'21.1"N 97°04'45.1"W
- County
- Butler
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Augusta Muni →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.