Skip to content
LOS Analyzer

Sign · 2026

S-15-649+18

Selinsgrove, PA · near Penn Valley (1.4 mi)

Marking and lightingRevision24 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"The CSVT project is an Interstate Highway facility on new location with an approximate length of 7 miles. The project will connect to 2 existing interchanges and include ramp modifications. It will include 11 new mainline and crossroad bridges as well as signing and lighting facilities."

Filing details

Case number (ASN)
2026-AEA-10789-OE
Structure
S-15-649+18
Type
Sign / road
Category
Sign
Height above ground
24 ft
Height above sea level
643 ft
Site elevation
619 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
—

Timeline

Filed
September 9, 2026
Determined
September 10, 2026
Determination expires
—

Who filed it

Sponsor
PennDOT District 3-0
Representative
Gannett Fleming, Inc

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by PennDOT District 3-0 →

Location

Coordinates
40.842081, -76.862611
Degrees / minutes / seconds
40°50'31.5"N 76°51'45.4"W
County
Snyder

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Penn Valley →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.