Crane · 2026
Dulles Gateway Crane
Herndon, VA · near Washington Dulles Intl (1.8 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"PROJECT DESCRIPTION: Proposed Construction of one 74ft AGL; 402ft AMSL Building (Building G) located at 2860 13925 Park Center Road Herndon VA 20171 for the DULLES GATEWAY PROJECT. \n\nCONSTRUCTION EQUIPMENT: Boom Crane 250ft AGL; 578ft AMSL\n• Crane on Site – January 21 2025 – April 21 2027.\n\nPermanent Structure ASN:2025-AEA-15127-OE"
Filing details
- Case number (ASN)
- 2026-AEA-1117-OE
- Structure
- Dulles Gateway Crane
- Type
- Crane
- Category
- Crane
- Height above ground
- 250 ft
- Height above sea level
- 578 ft
- Site elevation
- 328 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- Red lights and flags
Timeline
- Filed
- January 23, 2026
- Determined
- May 8, 2026
- Determination expires
- November 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Worldwide Mission Critical
- Representative
- Allen Aviation Consulting Services
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 38.938392, -77.428886
- Degrees / minutes / seconds
- 38°56'18.2"N 77°25'44.0"W
- County
- Fairfax
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Washington Dulles Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.