Construction equipment · 2026
PTD Fence Work Area W12
Potsdam, NY · near Potsdam Muni/Damon Fld (0.5 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"This 7460 for your review is for the Reconstruct Perimeter Fence project at Potsdam Municipal Airport AIP 3-36-0099-43-25. The permanent fence corner locations have been submitted under ASNs 2026-AEA-1179-NRA to 2026-AEA-1195-NRA. This project consists of the installation of approximately 15 350LF of 8' chain link fence with 3 strands of barbed wire and wildlife skirt and minor clearing along the fence line. Also included in this project is the installation of four manual cantilever slide gates. This is the submission for the Work Area W1 through W26."
Filing details
- Case number (ASN)
- 2026-AEA-1221-NRA
- Structure
- PTD Fence Work Area W12
- Type
- Construction / other
- Category
- Construction equipment
- Height above ground
- 17 ft
- Height above sea level
- 474 ft
- Site elevation
- 457 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- April 6, 2026
- Determined
- May 7, 2026
- Determination expires
- November 7, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Village of Potsdam
- Representative
- Passero Associates
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 44.670458, -74.953017
- Degrees / minutes / seconds
- 44°40'13.6"N 74°57'10.9"W
- County
- St. Lawrence
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Potsdam Muni/Damon Fld →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.