Skip to content
LOS Analyzer

Organisation · 2026 filings

Village of Potsdam — FAA obstruction filings

Village of Potsdam filed 51 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

51

Tallest proposed

17 ft

above ground level

Most recent filing

April 6, 2026

What is being filed

  • Construction equipment34
  • Fence17

Where

  • NY51

Most recent 50 filings

Newest first, of 51 total.

Perimeter Fence F172026-AEA-1179-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F162026-AEA-1180-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F152026-AEA-1181-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F142026-AEA-1182-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F132026-AEA-1183-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F122026-AEA-1184-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F112026-AEA-1185-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F102026-AEA-1186-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F92026-AEA-1187-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F82026-AEA-1188-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F12026-AEA-1189-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F22026-AEA-1190-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F32026-AEA-1191-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F42026-AEA-1192-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F52026-AEA-1193-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F62026-AEA-1194-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026Perimeter Fence F72026-AEA-1195-NRA · Fence · 9 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W12026-AEA-1210-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W22026-AEA-1211-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W32026-AEA-1212-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W42026-AEA-1213-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W52026-AEA-1214-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W62026-AEA-1215-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W72026-AEA-1216-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W82026-AEA-1217-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W92026-AEA-1218-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W102026-AEA-1219-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W112026-AEA-1220-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W122026-AEA-1221-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W132026-AEA-1222-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W142026-AEA-1223-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W152026-AEA-1224-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W162026-AEA-1225-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W172026-AEA-1226-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W182026-AEA-1227-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W192026-AEA-1228-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W202026-AEA-1229-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W212026-AEA-1230-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W222026-AEA-1231-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W232026-AEA-1232-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W242026-AEA-1233-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W252026-AEA-1234-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Work Area W262026-AEA-1235-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Primary Staging Area2026-AEA-1236-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Secondary Staging Area2026-AEA-1237-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Primary Haul Route H12026-AEA-1238-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Haulr Route H22026-AEA-1239-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence Secondary Haul Route H32026-AEA-1240-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence_Secondary Haul H42026-AEA-1241-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026PTD Fence_Secondary Haul H52026-AEA-1242-NRA · Construction equipment · 17 ft AGL · Potsdam, NYApril 6, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Village of Potsdam

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.