Construction equipment · 2026
Temporary Equipment
Reading, PA · near Reading Rgnl/Carl A Spaatz Fld (0.3 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"The proposal is notification for the Construction Safety Phasing Plan (CSPP) for a proposed West Hangar Infrastructure Project. The project involves site preparation and construction of three new hangars including a new stormwater management system. A separate 7460 package was submitted for the construction equipment for the proposed project. Proper NOTAMS will be issued for the project and all equipment will be marked when being used. See the attached CSPP for review."
Filing details
- Case number (ASN)
- 2026-AEA-1291-NRA
- Structure
- Temporary Equipment
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 25 ft
- Height above sea level
- 351 ft
- Site elevation
- 326 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- April 13, 2026
- Determined
- July 22, 2026
- Determination expires
- January 22, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Reading Regional Airport Authority
- Representative
- GFT Inc.
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 40.378394, -75.970550
- Degrees / minutes / seconds
- 40°22'42.2"N 75°58'14.0"W
- County
- Berks
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Reading Rgnl/Carl A Spaatz Fld →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.