Antenna tower · 2026
Mifflin Water-PA341
Milsroy, PA · near Mifflin County (3.9 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"Proposed 155 ft tower structure with an overall height of 159 ft with all appurtenances"
Filing details
- Case number (ASN)
- 2026-AEA-1334-OE
- Structure
- Mifflin Water-PA341
- Type
- Tower / antenna
- Category
- Antenna tower
- Height above ground
- 159 ft
- Height above sea level
- 1,398 ft
- Site elevation
- 1,239 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- January 27, 2026
- Determined
- May 5, 2026
- Determination expires
- November 5, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Diamond Towers V LLC
- Representative
- Donna Parolari
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 40.732836, -77.636292
- Degrees / minutes / seconds
- 40°43'58.2"N 77°38'10.7"W
- County
- Mifflin
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.