Skip to content
LOS Analyzer

Tank stack · 2026

2nd Courthouse Elevated Tank

Richmond, VA · near Richmond Exec/Chesterfield County (1.2 mi)

Preliminary findingsPending170 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"The Chesterfield Utilities Department desires to plan design and construct an elevated water tank called the Second Courthouse Elevated Tank in the Courthouse Pressure Zone (PZ). This storage tank will contribute to the need for increased storage capacity county wide and within the Courthouse pressure zone."

Filing details

Case number (ASN)
2026-AEA-5413-OE
Structure
2nd Courthouse Elevated Tank
Type
Water_system
Category
Tank stack
Height above ground
170 ft
Height above sea level
420 ft
Site elevation
250 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 16, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
WRA
Representative
Kelly Riggan

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
37.399603, -77.504386
Degrees / minutes / seconds
37°23'58.6"N 77°30'15.8"W
County
Chesterfield

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Richmond Exec/Chesterfield County →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.