Skip to content
LOS Analyzer

Antenna tower · 2026

Montross

MONTROSS, VA · near Tappahannock/Essex County (16.7 mi)

Determination of no hazardDetermined - No Hazard199 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Refiling existing tower to correct coordinates and ground elevation per 2C Survey. Adding C-band frequencies. Prior ASN: 2000-AEA-4667-OE"

Filing details

Case number (ASN)
2026-AEA-6499-OE
Structure
Montross
Type
Tower / antenna
Category
Antenna tower
Height above ground
199 ft
Height above sea level
337 ft
Site elevation
138 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
—

Timeline

Filed
May 20, 2026
Determined
July 8, 2026
Determination expires
—

Who filed it

Sponsor
Federal Airways & Airspace - JW
Representative
Clyde Pittman

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Federal Airways & Airspace - JW →

Location

Coordinates
38.096369, -76.832175
Degrees / minutes / seconds
38°05'46.9"N 76°49'55.8"W
County
Westmoreland

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.