Skip to content
LOS Analyzer

Construction equipment · 2026

Temporary Equipment

Smoketown, PA · near Smoketown (0.3 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The proposal is notification for the construction equipment anticipated to be used on a proposed runway rehabilitation project. The entire runway will be rehabilitated with crack repair full depth repair as needed seal coat and new pavement markings. The runway and taxiway will be closed during construction. A separate 7460 package will be submitted for the Construction Safety Phasing Plan (CSPP) for the project. Proper NOTAMS will be issued for the project and all equipment will be marked when being used. Survey Accuracy of 4D shall be used."

Filing details

Case number (ASN)
2026-AEA-717-NRA
Structure
Temporary Equipment
Type
Construction / vehicle
Category
Construction equipment
Height above ground
25 ft
Height above sea level
394 ft
Site elevation
369 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 2, 2026
Determined
April 28, 2026
Determination expires
October 28, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Smoketown Aviation, LLC
Representative
GFT, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
40.041633, -76.196878
Degrees / minutes / seconds
40°02'29.9"N 76°11'48.8"W
County
Lancaster

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.