Skip to content
LOS Analyzer

Antenna tower · 2026

Patriot 3

Patriot, IN · near Kentucky Speedway - Transport (11.2 mi)

Determination of no hazardDetermined - No Hazard363 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Application for FAA Avian Exemption"

Filing details

Case number (ASN)
2026-AGL-10590-OE
Structure
Patriot 3
Type
Tower / antenna
Category
Antenna tower
Height above ground
363 ft
Height above sea level
1,213 ft
Site elevation
850 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Red lights and paint

Timeline

Filed
June 30, 2026
Determined
August 14, 2026
Determination expires
—

Who filed it

Sponsor
Mission 1 Communications
Representative
Integrated Public Safety Commission - State of IN

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
38.870328, -84.850578
Degrees / minutes / seconds
38°52'13.2"N 84°51'02.1"W
County
Switzerland

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.