Skip to content
LOS Analyzer

Other · 2026

ASR 1002422 side marker alteration

TUSTIN, MI · near Wexford County (10.3 mi)

Marking and lightingRevision1,290 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"CORRECT HEIGHT OF STRUCTURE CHANNEL 9"

Filing details

Case number (ASN)
2026-AGL-11987-OE
Structure
ASR 1002422 side marker alteration
Type
Other
Category
Other
Height above ground
1,290 ft
Height above sea level
2,994 ft
Site elevation
1,704 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
Red lights and paint

Timeline

Filed
July 27, 2026
Determined
August 6, 2026
Determination expires
—

Who filed it

Sponsor
Heritage Broadcasting
Representative
Telecommunications LAW Professionals PLLC

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
44.136678, -85.342825
Degrees / minutes / seconds
44°08'12.0"N 85°20'34.2"W
County
Osceola

See every 2026 filing near Wexford County →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.