Skip to content
LOS Analyzer

Antenna tower · 2026

- WBUP-DT

Humboldt, MI · near Edward F Johnson (11.2 mi)

Marking and lightingRevision605 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Update marking/lighting specs.\nPrevious proposal to convert to dual red/white lighting was abandoned. Request FAA Style A2 lighting & paint."

Filing details

Case number (ASN)
2026-AGL-13123-OE
Structure
- WBUP-DT
Type
Tower / antenna
Category
Antenna tower
Height above ground
605 ft
Height above sea level
2,366 ft
Site elevation
1,761 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Red lights and paint

Timeline

Filed
August 13, 2026
Determined
August 18, 2026
Determination expires
—

Who filed it

Sponsor
Queen Bee's Knees LLC
Representative
Hatfield & Dawson Consulting EN Gineers

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
46.490592, -87.893469
Degrees / minutes / seconds
46°29'26.1"N 87°53'36.5"W
County
Marquette

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.