Skip to content
LOS Analyzer

Antenna tower · 2026

Ely 1000' Tower

REPUBLIC, MI · near Edward F Johnson (3.2 mi)

Marking and lightingRevision1,101 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Owner plans to change marking and lighting system. Current system is orange and white paint with red lighting (A4). Requesting lighting system change to a F3 High-Intensity Dual Obstruction Lighting System with Infrared.\n\nUnable to edit required fields when attempting Notice of Alteration.\n\nOld Study: 97-AGL-1440-OE"

Filing details

Case number (ASN)
2026-AGL-1630-OE
Structure
Ely 1000' Tower
Type
Tower / antenna
Category
Antenna tower
Height above ground
1,101 ft
Height above sea level
2,601 ft
Site elevation
1,500 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Dual-red and high intensity white

Timeline

Filed
January 21, 2026
Determined
March 10, 2026
Determination expires
—

Who filed it

Sponsor
Northern Michigan University
Representative
Northern Michigan University

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
46.352725, -87.854275
Degrees / minutes / seconds
46°21'09.8"N 87°51'15.4"W
County
Marquette

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.