Skip to content
LOS Analyzer

Other · 2026

Vapor Recovery Unit

Marshall, MI · near Brooks Fld (0.5 mi)

Determination of no hazardDetermined - No Hazard45 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"The proposed project will occur at the Buckeye Terminal located at 12451 Old US 27 N Marshall MI. The property is operated as a petroleum terminal with several petroleum storage tanks and a truck loading rack. The proposed project is to replace the truck loading rack control device. The new control device would potentially have a higher stack than the existing structure and could be as high as 45 feet. The existing storage tanks on the property are approximately 48 feet high."

Filing details

Case number (ASN)
2026-AGL-1878-OE
Structure
Vapor Recovery Unit
Type
Other
Category
Other
Height above ground
45 ft
Height above sea level
974 ft
Site elevation
929 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
Red lights

Timeline

Filed
January 27, 2026
Determined
March 9, 2026
Determination expires
September 9, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Buckeye Terminals, LLC
Representative
Gianna Aiezza

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
42.250261, -84.964483
Degrees / minutes / seconds
42°15'00.9"N 84°57'52.1"W
County
Calhoun

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.