Skip to content
LOS Analyzer

Bridge · 2026

McKenzie Cty Main St. Path Ped Bridge

Watford City, ND · near Watford City Muni (1.6 mi)

Determination of no hazardDetermined - No Hazard8 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"North side of Cherry Creek"

Filing details

Case number (ASN)
2026-AGL-2272-OE
Structure
McKenzie Cty Main St. Path Ped Bridge
Type
Bridge
Category
Bridge
Height above ground
8 ft
Height above sea level
2,078 ft
Site elevation
2,070 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 2, 2026
Determined
February 12, 2026
Determination expires
August 12, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Brosz Engineering
Representative
Andrew Osborn

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
47.787449, -103.283175
Degrees / minutes / seconds
47°47'14.8"N 103°16'59.4"W
County
McKenzie

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.