Skip to content
LOS Analyzer

Building · 2026

Hangar 2

Groton, SD · near Groton Muni (0.1 mi)

DeterminationDetermined - No Hazard30 ft AGL

What this outcome means

No determination is recorded on this case in the FAA's published archive. Cases still under study show no determination until the aeronautical study closes.

The proposal, in the filer's words

"Construction of Hangar to the West of the runway at the Groton Municipal Airport"

Filing details

Case number (ASN)
2026-AGL-2479-NRA
Structure
Hangar 2
Type
Building / hangar
Category
Building
Height above ground
30 ft
Height above sea level
1,335 ft
Site elevation
1,305 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 19, 2026
Determined
April 2, 2026
Determination expires
October 2, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
City of Groton
Representative
IMEG Consultants CORP

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
45.533475, -98.095272
Degrees / minutes / seconds
45°32'00.5"N 98°05'43.0"W
County
Brown

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.