Skip to content
LOS Analyzer

Construction equipment · 2026

Excess Material Waste Zone 109

Rapid City, SD · near Rapid City Rgnl (0.7 mi)

Returned to proponentDetermined - No Hazard30 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Construction equipment for the construction of the Remote Parking Apron At RAP"

Filing details

Case number (ASN)
2026-AGL-3707-NRA
Structure
Excess Material Waste Zone 109
Type
Construction / other
Category
Construction equipment
Height above ground
30 ft
Height above sea level
3,159 ft
Site elevation
3,129 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 10, 2026
Determined
April 28, 2026
Determination expires
October 28, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Rapid City Regional Airport
Representative
Mead & Hunt

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Rapid City Regional Airport →

Location

Coordinates
44.035656, -103.063753
Degrees / minutes / seconds
44°02'08.4"N 103°03'49.5"W
County
Pennington

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Rapid City Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.