Skip to content
LOS Analyzer

Organisation · 2026 filings

Rapid City Regional Airport — FAA obstruction filings

Rapid City Regional Airport filed 13 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

13

Tallest proposed

60 ft

above ground level

Most recent filing

March 10, 2026

What is being filed

  • Construction equipment13

Where

  • SD13

Filings

Crane Operation Zone 2042026-AGL-3703-NRA · Construction equipment · 60 ft AGL · Rapid City, SDMarch 10, 2026Crane Operation Zone 2032026-AGL-3704-NRA · Construction equipment · 60 ft AGL · Rapid City, SDMarch 10, 2026Crane Operation Zone 2022026-AGL-3705-NRA · Construction equipment · 60 ft AGL · Rapid City, SDMarch 10, 2026Crane Operation Zone 2012026-AGL-3706-NRA · Construction equipment · 60 ft AGL · Rapid City, SDMarch 10, 2026Excess Material Waste Zone 1092026-AGL-3707-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Excess Material Waste Zone 1082026-AGL-3708-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Excess Material Waste Zone 1072026-AGL-3709-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Excess Material Waste Zone 1062026-AGL-3710-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Project Construction Limits 1052026-AGL-3711-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Project Construction Limits 1042026-AGL-3712-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Project Construction Limits 1032026-AGL-3713-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Project Construction Limits 1022026-AGL-3714-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026Project Construction Limits 1012026-AGL-3715-NRA · Construction equipment · 30 ft AGL · Rapid City, SDMarch 10, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Rapid City Regional Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.