Skip to content
LOS Analyzer

Solar · 2026

Summit Lake Solar

Reading, MN · near Worthington Muni (6.1 mi)

Determination of no hazardDetermined - No Hazard18 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Construction of large solar array mounted on single axis trackers"

Filing details

Case number (ASN)
2026-AGL-3865-OE
Structure
Summit Lake Solar
Type
Electrical_system / solar_panel
Category
Solar
Height above ground
18 ft
Height above sea level
1,735 ft
Site elevation
1,717 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 25, 2026
Determined
March 10, 2026
Determination expires
September 10, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Summit Lake Solar, LLC
Representative
Summit Lake Solar, LLC

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
43.702855, -95.681243
Degrees / minutes / seconds
43°42'10.3"N 95°40'52.5"W
County
Nobles

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.