Skip to content
LOS Analyzer

Tank stack · 2026

DIB - Lighting Change

Craford, IL · near Crawford County (4.2 mi)

Marking and lightingRevision208 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"LIGHTING CHANGE REQUEST. Document uploaded to 2026-AGL-1988"

Filing details

Case number (ASN)
2026-AGL-4134-OE
Structure
DIB - Lighting Change
Type
Stack
Category
Tank stack
Height above ground
208 ft
Height above sea level
753 ft
Site elevation
545 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
March 4, 2026
Determined
March 18, 2026
Determination expires
—

Who filed it

Sponsor
C & I Engineering
Representative
Clint Knaggs

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
38.995617, -87.724244
Degrees / minutes / seconds
38°59'44.2"N 87°43'27.3"W
County
Crawford

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.