Building · 2026
Crystal Apartments
Crystal, MN · near Crystal (0.9 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"7000 56th Street is a 5-story multi-family housing development with approximately 178 units ranging in size from alcove to 3-bedroom units and 262 parking spaces both underground and surface spaces. The project site is currently occupied by a 2-story bank and large amount of surface parking. The project seeks to provide a high-quality housing development with a vast amount of green space and private recreational space while reorganizing the site to improve the public realm and Bass Lake Road streetscape to add more vibrancy to the City of Crystal.\nConstruction consists of 5 wood framed floors of Type IIIB construction over a Type IA precast concrete podium. Coordinates for each corner of the building have been submitted. Construction will begin May 2026 with a building completion in July 2027."
Filing details
- Case number (ASN)
- 2026-AGL-4258-OE
- Structure
- Crystal Apartments
- Type
- Building
- Category
- Building
- Height above ground
- 66 ft
- Height above sea level
- 943 ft
- Site elevation
- 877 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- March 6, 2026
- Determined
- April 10, 2026
- Determination expires
- October 10, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Yellow TREE Development
- Representative
- Yellow Tree Construction Services
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 45.055808, -93.369289
- Degrees / minutes / seconds
- 45°03'20.9"N 93°22'09.4"W
- County
- Hennepin
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Crystal →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.