Skip to content
LOS Analyzer

Construction equipment · 2026

WORK LIMIT-7

Bismarck, ND · near Bismarck Muni (0.6 mi)

Returned to proponentDetermined - No Hazard35 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This point is for the limits of the work area for construction equipment that will be present on site and moving around the construction area as shown on the attached Construction Safety Phasing Plan for the Runway 3-21 and Taxiway D Rehabilitation - Phase 2 Project."

Filing details

Case number (ASN)
2026-AGL-4410-NRA
Structure
WORK LIMIT-7
Type
Construction / other
Category
Construction equipment
Height above ground
35 ft
Height above sea level
1,694 ft
Site elevation
1,659 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 17, 2026
Determined
May 19, 2026
Determination expires
November 19, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Bismarck Municipal Airport
Representative
KLJ Engineering

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Bismarck Municipal Airport →

Location

Coordinates
46.765247, -100.752292
Degrees / minutes / seconds
46°45'54.9"N 100°45'08.3"W
County
Burleigh

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Bismarck Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.