Construction equipment · 2026
Project 1411-00-71 Gold Star Mem Trail
Horicon, WI · near Dodge County (1.3 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"The Dodge County Land Resources and Parks Department in conjunction with the Wisconsin Department of Transportation will be constructing an approximately 2.3-mile-long bike/pedestrian (multi-use) trail along the north side of WIS 33 from the Wild Goose State Trail to City View Blvd in the City of Horicon Dodge County Wisconsin.\n\nThis notice is being submitted since the FAA OE/AAA Pre-Screening Results noted that a notice needs to be filed with the FAA for the construction equipment that will be onsite during construction."
Filing details
- Case number (ASN)
- 2026-AGL-6468-OE
- Structure
- Project 1411-00-71 Gold Star Mem Trail
- Type
- Construction / vehicle
- Category
- Construction equipment
- Height above ground
- 100 ft
- Height above sea level
- 1,041 ft
- Site elevation
- 941 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- April 27, 2026
- Determined
- May 19, 2026
- Determination expires
- November 19, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Dodge County LAND Resources AND Parks Department
- Representative
- MSA Professional Services, Inc.
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 43.444974, -88.695800
- Degrees / minutes / seconds
- 43°26'41.9"N 88°41'44.9"W
- County
- Dodge
- Open in a map
- Google MapsOpenStreetMap
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.